City of St. Albert Dunvegan Court Road Reconstruction – 2010

General Contractor for the removal of the existing roadway that had existing drainage issues. The scope of work included cutting to design subgrade elevation; installing perforated pipe & additional catch basins; cement stabilization; graveling, milling tie ins; paving; concrete work; and sod landscape restoration.