City of St. Albert Havenwood Storm Pond Excavation – 2011

General Contractor on this project that included enhancing the existing storm pond in order to improve the drainage; increase the storm water capacity; and create a functioning wet pond. This pond construction included case boring a new pond outlet to establish a new normal water level and replace the existing collapsed pipe; excavation of the pond to the new design elevation; installation of a liner; replace salvaged live soil over the liner; repair various concrete trails; landscaping and plantings.